+ the_SPANIARD


 

Location:  527 Concord El Segundo, California, United States of America 90245.

Client:  withheld

Site Area: 7,500 sq ft / 0.07 hectares Size: 3,634 gross sq ft / 349.78 gross sq m

Program:  This is a an existing 1939, three bedroom, two bath, post war home, with an auxiliary building and detached two car garage. The program is to add five hundred square feet to the existing home, expanding the master bedroom and master bathroom. The interior wall seperating the family room and the kitchen wiill be romved to make one great room. A four hundred and twenty square foot wood deck will also be added to the back of the house. Curb appeal is a big focus, on this home. The addition of new aluminum windows, a new entry condition, new stucco, and a roof, elimanting the spanish tile, and the crafstmen mulions in the windows, will tie the project into one aesthetic. The addition of skylights, and one large sliders, that will share the same guide track will allow the new xeriscape yard to enter into the home.

Design: 2014, Construction: 2015

Type: residential modern/remodel

Project Team

Design + Build: hu mn lab,+inc.

General Contractor: Sean Icaza, Construction, Inc.

Structural/MEP Engineer: Paul Christensen, C.E., S.E.

Soils Engineer: Jonathan Miller, CEG Bay Cities Geology

Green Roof: Justin Ewart/AAWRP

Photography: DNA Photography